Day Two: The Get In Continues

Posted on Posted in Edinburgh fringe festival 2013

So we woke up to traditional Edinburgh weather for the lovely walk to work. We started the day by unloading the truck full of hired lighting and sound equipment into there designated spaces with half of the load being tipped at Zoo and half at south side. After tipping the equipment truck we had the Zoo container to empty which contained everything else needed to construct the venues at South Side.

Container CueEmpty Container

 

 

After finally emptying the container we broke for Lunch 🙂

 

After Lunch we split into teams with one group starting on the floor in the Main House

Main House BareAnother group stated on the Studio space

Studio BareAnd the rest of us unpacked then packed and then unpacked the van shuttling stuff between venues.

After Tea the two groups at south side continued with their tasks and the rest of us headed over to Zoo to build the seating in Monkey House.

 

Leave a Reply